04-02-2014, 10:42 AM
Just done this myself, using that guide to help, it's not terrible but it takes time, I did it over 2 days, bagged and labeled all screws and bolts, good practice
Phase 1 D-Turdo, K14@24 psi, De-cat, meaty backbox, Bosch pump, grinded LDA pin, duel air fed K&N =133.7bhp & 188ft/lbs