18-05-2017, 11:46 AM
Picked up my balanced crank assembly yesterday afternoon and dropped off the cylinder head while I was there for porting and CNC valve contour, gotta wait about a month for that though because they've got a lot of work on.
Waiting on a quote for my rods, as soon as I hear back I'll give them the go ahead but not sure on the turn around time for those.
In the meantime I'll be carrying on with the engine bay, subframe, steering rack etc
Got a fair bit of wiring to sort out as well so there's plenty for me to be getting on with!
Waiting on a quote for my rods, as soon as I hear back I'll give them the go ahead but not sure on the turn around time for those.
In the meantime I'll be carrying on with the engine bay, subframe, steering rack etc
Got a fair bit of wiring to sort out as well so there's plenty for me to be getting on with!