08-01-2014, 07:22 PM
Ok, Engine bay is all done now.
Recieved the big end bearings and main bearings today, collecting the thrust washers from Peugeot tomorrow.
Waiting for a clutch kit, once that arrives, sending the bottom end off to connaught engineering to have it blueprinted.
Having gearbox dramas at the mo as you can see on my other thred. Waiting for the supplier to get back to me. Basically my gearbox came with the reverse cable cut off and no gear lever lift.
Will post some pics soon.
Recieved the big end bearings and main bearings today, collecting the thrust washers from Peugeot tomorrow.
Waiting for a clutch kit, once that arrives, sending the bottom end off to connaught engineering to have it blueprinted.
Having gearbox dramas at the mo as you can see on my other thred. Waiting for the supplier to get back to me. Basically my gearbox came with the reverse cable cut off and no gear lever lift.
Will post some pics soon.
1999 2.0 8v Turbo 306
Flying the Flag for the XU10J2TE
You Tube: 832 Performance
Flying the Flag for the XU10J2TE
You Tube: 832 Performance