26-05-2020, 08:30 PM
Okay so have made an attack on the sub frame yesterday with it being one of the last things needing sorted before the engine goes back in.
Stripped, ready for degreasing/sandblasting..
Coated with etching primer..
Was working too hard I forgot to take any more progress pics.. but you get the point [emoji28]
And we have it ready for refitting with 2x new Moog arms with balljoints fitted, steering boot set fitted and a general tidying up with the rest of the parts.
And its in!!! Tricky job with 2 hands and a trolley jack, didn’t have my engine crane to use as the engine is resting on it [emoji3061]
Just have brake lines to sort now for the abs delete and the engine should be ready for fitting once the Vibra-Techs come! Getting exciting now [emoji1]
Stripped, ready for degreasing/sandblasting..
Coated with etching primer..
Was working too hard I forgot to take any more progress pics.. but you get the point [emoji28]
And we have it ready for refitting with 2x new Moog arms with balljoints fitted, steering boot set fitted and a general tidying up with the rest of the parts.
And its in!!! Tricky job with 2 hands and a trolley jack, didn’t have my engine crane to use as the engine is resting on it [emoji3061]
Just have brake lines to sort now for the abs delete and the engine should be ready for fitting once the Vibra-Techs come! Getting exciting now [emoji1]