17-04-2015, 05:54 PM
So today has consisted of pulling the engine out. Removing the pas and all components. Fitting all parts like clutch gearbox pump etc to 2.1. Test fitting the 2.1 and the turbo. Which sit in the bay lovely. Then removing engine again to stone chip the bay looks a bit better than rust. Tomorrow hoping to have it running(ish).
On a break from 306oc for personal reasons. If anyone needs or wants me most of you have my number and or facebook messenger
Thanks for the good times guys n gals. I might be back. Who knows.
Thanks for the good times guys n gals. I might be back. Who knows.