12-08-2013, 06:20 PM
Update
All cyclones are finished and on, coilovers are on too, being lowered to the right height tomorrow and also the backs being lowered to match
Had bit of trouble getting the drop link off so had to cut off the bolt with the Torx inside as the Torx had rounded off :/
£22 later, new drop links on.
More pics tomorrow when it's lowered
All cyclones are finished and on, coilovers are on too, being lowered to the right height tomorrow and also the backs being lowered to match
Had bit of trouble getting the drop link off so had to cut off the bolt with the Torx inside as the Torx had rounded off :/
£22 later, new drop links on.
More pics tomorrow when it's lowered