15-11-2012, 10:42 PM
Would have thought with the load not being that great, it just seems a bit overkill.
Where abouts do you reckon would be best? I'm vaguely aware something can be done between the C pillars
Where abouts do you reckon would be best? I'm vaguely aware something can be done between the C pillars
Daily Slag: http://306oc.co.uk/forum/thread-3849.html
Track Slag: http://306oc.co.uk/forum/thread-8873.html
Track Slag: http://306oc.co.uk/forum/thread-8873.html