16-06-2013, 03:57 PM
Car runs; after Niall diagnosing for a few hours, it's running.
As PPC is cancelled, the next deadline is the dyno day; just need some fluids topped up, a good run, watch it closely, a damn good clean then look at the small upgrades; brakes, ARB then look at turbo fitting
As PPC is cancelled, the next deadline is the dyno day; just need some fluids topped up, a good run, watch it closely, a damn good clean then look at the small upgrades; brakes, ARB then look at turbo fitting
Diablo Hdi Dturbo and 205 1.9 project - it lives!