TU tappet adjustment

Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
TU tappet adjustment
#1
Might be useful for someone one day:

1)to check the clearances you need to take the rocker cover and baffle plate
off,revealing the rocker assemblies.

2)Take off the cambelt cover.You will be ale to see a big nut in the
camshaft pulley.You can attach a socket and bar to this and use it to turn
over the engine.To make this easier,take the spark plugs out first to let
out the compression as you turn the engine over

3)with some feeler gauges,check the gap between the rocker and valve when
the following valves are open.(Open each listed valve in turn by cranking
the engien with the socket and bar,and noting when the relevant valve is
fully open: look at the cam and you will see when it has hit the highest
point on the lobe,if you know what I mean)


Valve open Check valve clearances on...
Cyl. 1 exhaust cyl 3 inlet,cyl.4 exhaust
Cyl. 3 exhaust cyl 4 inlet,cyl 2 exhaust
Cyl. 4 exhaust cyl 2 inlet,cyl 1 exhaust
Cyl. 2 exhaust cyl 1 inlet,cyl 3 exhaust

If you forget what valves you checked halfway through,just remember that
each valve checking sequence follows the firing order,1-3-4-2 Wink


4) if any clearances are out,loosen the adjusting screw locknut and
tighten/loosen the screw.Then tighten the locking nut back up while holding
the screw steady.

Once done,reassemble.

Oh aye the valve clearances are as follows!

Inlet 0.2mm
exhaust 0.4mm
Project: Formula Peugeot
Reply
Thanks given by:
#2
Worth noting...are those clearances when cold or warm?
Wishes for more power...
Reply
Thanks given by:
#3
cold engine - although it has to be said that i first did mine on a friggin cold day, probably around 1 or 2 degrees, and they turned out to be too tight a clearance when i did them about a month back on a 20 degree day- only by about .05mm, but i would definately do them when it's warm out.
Project: Formula Peugeot
Reply
Thanks given by:
#4
I used to run mine at 0.15 and 0.35mm.
Custom roll cages/shiny suspension bits/general fabrication work undertaken, PM me.
Top engine mount repair/reinforcement/chocking for cracked chassis and high powered cars, drive in, drive out, 2 hour turnaround.
Reply
Thanks given by:


Forum Jump:


Users browsing this thread: 1 Guest(s)