16-04-2012, 09:41 AM
Well, I bought enough tube to do 2 basic cages and have a bit spare in case of fook ups.
But the last car ended up with rather more tubes than originally planned, so may as well do a bit of discount and get the offcuts/rest out of the way on a rear half cage
But the last car ended up with rather more tubes than originally planned, so may as well do a bit of discount and get the offcuts/rest out of the way on a rear half cage
Custom roll cages/shiny suspension bits/general fabrication work undertaken, PM me.
Top engine mount repair/reinforcement/chocking for cracked chassis and high powered cars, drive in, drive out, 2 hour turnaround.
Top engine mount repair/reinforcement/chocking for cracked chassis and high powered cars, drive in, drive out, 2 hour turnaround.