03-03-2017, 10:49 AM
Friday: on site in cwmbran welding on a 16ft spiral chiller, all 316 stainless steel. Currently waiting for the health and safety mong to come back with a hot works permit even though I've already done half the job lol
Saturday: packing up the house
Sunday: packing up the house, drain the fish tank etc. Exciting....
Saturday: packing up the house
Sunday: packing up the house, drain the fish tank etc. Exciting....
Current stable
'09 Mercedes E320cdi wagon
'99 306 gti6
'09 Mercedes E320cdi wagon
'99 306 gti6