10-10-2016, 09:28 AM
Thought id update this, A fair bit has been done since the last update. Engine has been pulled to bits as it had suspected head lift. Head was stripped, skimmed on all surfaces and pressure tested. All new valves, stem seals etc, new victor rein gasket and full arp studs from the states.
New cambeltkit, water pump and a general paint up of parts. Manifold was wrapped after abit of a tweak.
Turbo refitted, and i started on the downpipe. Excuse my tig work still learning
We decided on a second v band as the top half is a real pain (poor design by me) just waiting on the exhaust box
Stef
New cambeltkit, water pump and a general paint up of parts. Manifold was wrapped after abit of a tweak.
Turbo refitted, and i started on the downpipe. Excuse my tig work still learning
We decided on a second v band as the top half is a real pain (poor design by me) just waiting on the exhaust box
Stef
90' 205 gti6 supercharged
05' Evo 9 IX GT
Team eaton.
Axle rebuilds please contact me for your needs.
https://www.facebook.com/axlesbystef/
05' Evo 9 IX GT
Team eaton.
Axle rebuilds please contact me for your needs.
https://www.facebook.com/axlesbystef/