13-05-2016, 09:12 PM
I'd be wanting a lot of concrete and blocks+rebar in the thing, more like a concrete pad set into the ground, and for that effort, I'd try and just get a 2 post lift in the workshop, even if it means lifting the existing roof by a metre+