22-10-2015, 12:31 PM
(This post was last modified: 22-10-2015, 02:56 PM by Rippthrough.)
I've heard/seen some bad tales/examples of their mapping, but nothing about the turbo's
Custom roll cages/shiny suspension bits/general fabrication work undertaken, PM me.
Top engine mount repair/reinforcement/chocking for cracked chassis and high powered cars, drive in, drive out, 2 hour turnaround.
Top engine mount repair/reinforcement/chocking for cracked chassis and high powered cars, drive in, drive out, 2 hour turnaround.