i suppose they are aimed at the "I HAZ MONEES MAKE CAR FAZTR" crew *cough peg cough* rather than people with any common sense..
£5000 for a stage3....
when considering it costs £7200 to have a 4.0litre V8 TVR engine completely rebuild, bored to 5 litres, re-sleeved with all of the additional work, (below is a lisut of what you get for that)
Parts
Pistons
Con rods
Main bearings
Big end bearings
Camshaft
Vernier chain set
Hydraulic lifters
Complete engine gasket set
Spark plugs
Modified EPROM
Oil Pump Gears
Double valve springs
Large valves
Crankshaft
LABOUR:
Re balance crankshaft assy
Lighten flywheel
Port cylinder heads
Strip & rebuild engine
3 Angle valve seats
Line hone
Skim block
Skim heads
Cc chambers
Balance rods & pistons
Port intake plenum
Modify trumpet base
£5000 for a stage3....
when considering it costs £7200 to have a 4.0litre V8 TVR engine completely rebuild, bored to 5 litres, re-sleeved with all of the additional work, (below is a lisut of what you get for that)
Parts
Pistons
Con rods
Main bearings
Big end bearings
Camshaft
Vernier chain set
Hydraulic lifters
Complete engine gasket set
Spark plugs
Modified EPROM
Oil Pump Gears
Double valve springs
Large valves
Crankshaft
LABOUR:
Re balance crankshaft assy
Lighten flywheel
Port cylinder heads
Strip & rebuild engine
3 Angle valve seats
Line hone
Skim block
Skim heads
Cc chambers
Balance rods & pistons
Port intake plenum
Modify trumpet base
Given the choice between Niall and the sheep. I would choose the sheep!
/Toseland
/Toseland