15-05-2015, 05:53 AM
(This post was last modified: 15-05-2015, 05:53 AM by highwayman306.)
Fri: Work 'til 13:30 then pick up some bits and bobs for car
Sat: Fit ARB bushes and drop links then fill tank and add some 2 stroke
Sun: Prepare for long drive to test said work
hope all goes well...
Sat: Fit ARB bushes and drop links then fill tank and add some 2 stroke

Sun: Prepare for long drive to test said work

![[Image: 9fa12c59-0c3d-4413-968d-6a7840ff068f.jpg]](http://i693.photobucket.com/albums/vv295/highwayman306/9fa12c59-0c3d-4413-968d-6a7840ff068f.jpg)
Stage 1 HDi DTurbo Diablo 5dr, "Dee-Dee"