18-12-2014, 09:37 PM
Done a small amount of work on this this week, Made a visit to local hydro place for a selection of fittings, wanted to convert all the old load / unloader lines to modern 10mm push fit for ease, so bought a load of adapters, and bends etc to make that work, Have just screwed the adaptors into the brake for now, and will plumb up fully once its more together, but got the number 1 brake back in the chassis and bolted up to frame / roller, and plumbed in the heat exchanger / thermo valve for it, and also mounted the clayton load cell, This will likely be replaced with a modern load cell for computer data acquisition in the long run, but for testing the retro dials will be used!
Brake 1 in frame:
And some pipework in:
Hoping to get the new stator in next few days so can assemble the second brake and get that in the frame also!
Brake 1 in frame:
And some pipework in:
Hoping to get the new stator in next few days so can assemble the second brake and get that in the frame also!
| Dyno Power Runs & Steady State Facilities Available, Just Ask Anytime |
| #DervMafia |
| #DervMafia |