18-11-2014, 09:48 PM
Still quite a bit to do yet.... need to re assemble the frames, drop rollers back in, fix to floor, re assemble roller brake for loading, and then re assemble both water brakes (waiting on some small parts), then temporary rig up the old analog dials to see if the thing will work, and if so, order up some new load cells / data AQ stuff. oh and weld up some tie down points / design a pull down system to sit between the rollers im thinking...
| Dyno Power Runs & Steady State Facilities Available, Just Ask Anytime |
| #DervMafia |
| #DervMafia |