09-05-2014, 06:43 PM
(09-05-2014, 06:40 PM)cully Wrote:(09-05-2014, 06:31 PM)Niall Wrote: This was a permanent solution Paul. They emptied the tray at the bottom of the board every 3 days. It had limescale in it lol
well atleast ive drilled holes in the bottom of the board here
laundrys water and electric ive seen a few large Flash outs
the sight and the sound of a large 3 phase arc is quit impresive
It is. Saw a builder go through a 3 phase cable into a distribution room on a new build once supplying 10 flats. Ive never seen a man fly so far. Surprisingly him and his drill were ok but the bit had been blown to pieces! I bet his arse was the size of a dinner plate after that!
In all fairness to him, the cable had been run in completely the wrong place (and illegally if you go against IEE) The electric board were soon on site replacing it free of charge with their tales in-between their legs whilst a sparking builder shouted at them

Team Eaton
1999 China Blue 306 GTi6 - Eaton Supercharged - 214.5bhp 181lbft
1999 China Blue 306 GTi6 - Eaton Supercharged - 214.5bhp 181lbft