27-04-2014, 11:04 AM
Wash powder, bit of boiling water to make a paste, scrub it in and leave it a while before rinsing off.
Custom roll cages/shiny suspension bits/general fabrication work undertaken, PM me.
Top engine mount repair/reinforcement/chocking for cracked chassis and high powered cars, drive in, drive out, 2 hour turnaround.
Top engine mount repair/reinforcement/chocking for cracked chassis and high powered cars, drive in, drive out, 2 hour turnaround.