19-02-2014, 11:07 AM
(This post was last modified: 19-02-2014, 11:21 AM by Rippthrough.)
Alright pal, I'll stick them to one side.
edit: added a few more odds and sods to the post.
edit: added a few more odds and sods to the post.
Custom roll cages/shiny suspension bits/general fabrication work undertaken, PM me.
Top engine mount repair/reinforcement/chocking for cracked chassis and high powered cars, drive in, drive out, 2 hour turnaround.
Top engine mount repair/reinforcement/chocking for cracked chassis and high powered cars, drive in, drive out, 2 hour turnaround.