Really cba with writing this out properly, so here's a list of what has been done and what will be done next weekend:
- Remove engine and change all filters, fluids and belts
- Replace various split pipes in engine bay
- Wire up new glow-plug relay
- Fit new injector washers and leak-offs
- Clean out all rust, weld up holes md underseal/paint as required
- Fit new aerial and ns mirror control arm
- Replace steering column and lower UJ
- Weld up new exhaust system
- Change steering wheel and gearknob
- Clamp sunroof shut and seal
- Remove engine and change all filters, fluids and belts
- Replace various split pipes in engine bay
- Wire up new glow-plug relay
- Fit new injector washers and leak-offs
- Clean out all rust, weld up holes md underseal/paint as required
- Fit new aerial and ns mirror control arm
- Replace steering column and lower UJ
- Weld up new exhaust system
- Change steering wheel and gearknob
- Clamp sunroof shut and seal