11-01-2012, 11:44 PM
silverzx Wrote:Would be guaranteed to out do a stage 1'd XUD too..
Fixed.
Custom roll cages/shiny suspension bits/general fabrication work undertaken, PM me.
Top engine mount repair/reinforcement/chocking for cracked chassis and high powered cars, drive in, drive out, 2 hour turnaround.
Top engine mount repair/reinforcement/chocking for cracked chassis and high powered cars, drive in, drive out, 2 hour turnaround.